Marine Max Sarasota

Sarasota, FL

Engineering Excellence in the Redevelopment of Marine Max Sarasota Basin

Golden Marine Systems rose to the challenge presented by the redevelopment and design of the Marine Max Sarasota basin. The constraint of a narrow 42″ wide staging dock could have posed stability issues, but their innovative solution, the dock stabilizer, demonstrates their commitment to problem-solving and ingenuity. Winning the 2021 NMMA Innovation Award for this device further underscores its effectiveness and uniqueness in the industry. The marina redevelopment consisted of two staging docks totaling 2650 square feet and 15 fixed docks for a total of 360 square feet. The integration of Golden’s 850 Series aluminum system with IPE fascia and urethane fenders ensures durability and reliability, crucial for withstanding the demands of a busy marine environment.
The choice of brick paver decking not only adds to the aesthetics but also maintains consistency with Marine Max’s signature look. The inclusion of 12″ GMS adjustable cleats and pile guides enhances functionality and usability for users of the dock. Overall, it’s clear that Golden Marine Systems provided a comprehensive solution tailored to the specific challenges of the Marine Max Sarasota basin project, showcasing their expertise and dedication to excellence in marine engineering and design.
Slide
Slide
Slide
Slide
previous arrow
next arrow
Slide
Slide
Slide
Slide
previous arrow
next arrow

More Projects: